Town of Parish, Lead Agency in Joint Water Project with Village of Parish, Requests Engineering Services Proposals

The Town is working as the lead agency on a joint water project with the Village of Parish. Town of Parish Water Supply Area No. 1 is a new water service area in the Town which includes the Village in its entirety.

The Project will connect to the existing water main system in the Town of Hastings and will provide a new pump station and water storage tank to serve the Water Supply Area.

The Town is in need of engineering services to submit funding applications to New York State Environmental Facilities Corporation (EFC) for both the NYS Water Infrastructure Improvement Act (WIIA) and NYS Intermunicipal Water Infrastructure Grant Program (IMG) and United States Department of Agriculture – Rural Development (RD)  as well as to complete the Design and provide Construction Phase Engineering services for the Project as outlined above.

The proposal should include the necessary work to perform the complete design which may include but is not limited to: survey, geotechnical report, and any federal, state or local permitting required. This proposal should also include all work related to submitting funding applications on behalf of the Town.

The Proposal must be submitted in electronic form, signed by an authorized officer of the Proposer, and received by 1:00 p.m. on April 13, 2020 to be considered. The size of the electronic submittal shall not exceed 3 MB. If the file exceeds 3 MB other delivery arrangements should be made.

Proposals are to be submitted to: mburt@danc.org  Proposals received after the time and date specified above will not be accepted and will be returned. This project will require M/WBE/EEO participation as well as SDVOB.